Start with the site water balance
A practical rainwater-harvesting proposal reviews roof and paved catchments, rainfall information, runoff routes, storage space, intended non-potable uses and overflow arrangements. Field measurements and local conditions affect the design.
Planning and delivery
AMEE’s profile lists both planning and implementation. The project scope can set out surveys, calculations, storage and recharge concepts, drawings, civil interfaces and commissioning responsibilities, subject to site assessment and approvals where applicable.
Design for maintenance
Screening, first-flush arrangements, safe access, sediment removal and periodic inspection should be considered from the start. Expected capture is an estimate based on assumptions, not a guaranteed year-round supply.
